Job description
About the job QC Engineer (5 Month)
Requirement: TAQA approval. If TAQA approval is not available, other UAE utility approval is required.
- (NCR etc..) after validation of the Site Manager.
- · Scheduling audits of the Subcontractors regarding documentation and quality follow-up.
- · Conducting IPI / FI checks during project execution as per QMS checklists.
- · Preparing fortnightly report of QMS at site.
- · Preparation of Method Statement / Work Instructions related to Works.
- · Qualitative control of the packaging (shock, indicator, scars, and bents.)
- · Quantitative and qualitative of the materials/equipment versus packing lists.
- · Control of the incoming & outgoing material to/from storage areas (respect of registering and documenting MR reports).