Job description
Petrofac is a leading international service provider to the energy industry, with a diverse client portfolio including many of the world’s leading energy companies.
We design, build, manage and maintain infrastructure for our clients. We recruit, reward, and develop our people based on merit regardless of race, nationality, religion, gender, age, sexual orientation, marital status or disability. We value our people and treat everyone who works for or with Petrofac fairly and without discrimination.
The world is re-thinking its energy supply and energy security needs, planning for a phased transition to alternative energy sources. We are here to help our clients meet these evolving energy needs.
This is an exciting time to join us on this journey.
We support flexible working requests and have adopted a hybrid approach for most of our office-based roles. We ask employees to be present in the office at least three days per week.
Are you ready to bring the right energy to Petrofac and help us deliver a better future for everyone?
JOB TITLE: Senior Inspector I - Quality (Coating & Insulation) - Fabn Yard
Work Location: Mussafah, Abu Dhabi.
KEY RESPONSIBILITIES:
Painting / Coating:
·Ensure weather conditions are acceptable in line with applicable standards/ specifications (Environmental, time and economic constraints).
·Ensure manufacturer’s instructions and MSDS are followed while handling & storage of Painting/Coating materials abrasives at site.
·Ensure that data sheets are available, material traceability is maintained and correct material used.
·Monitor performance of contractors, ensure Applicators are competent and where required have valid certification for the process in use, equipment is in serviceable condition.
·Ensure inspection and test equipment is serviceable, with in calibration period and personnel are knowledgeable in its use.
·Ensure weld area is covered before blasting, where pressure testing is not completed.
·Ensure protection of flange serration, instruments etc before blasting.
·Ensure surface preparation blast profile/cleanliness meet requirements.
·Continuous monitoring of surface cleanliness and record surface profile (Should take place at least three times during the coating process: before any surface preparation activities starts, after surface preparation, before coating begins and between each application of coating in a multi-coat system).
·Monitor wet film thickness during application and application technique.
·Monitor dry film thickness and recoating intervals.
·Ensure any identification marks or tags removed or over coated are replaced.
·After the full curing activity conduct visual inspection and specified non-destructive and/or destructive tests.
·Visual inspection after each coat (Verify correct shade, degree of gloss and evenness and be free from tackiness after drying/curing and free from cracks, holidays, runs sags, wrinkles, patches, brush or roller marks or other defects that may deleterious to the quality of the coating).
·Witness destructive tests as applicable in accordance with the project specifications (Holiday detection, Adhesion testing, Impact resistance testing, Cathodic dis-bondment testing, Thickness of coating on steel body, Thickness of coating on weld bead, Peel test, Overall degree of adhesion ,voids exposing bare metal).
·Check for any damages and defects upon completion of each stage of painting/coating works.
Insulation:
·Inspect insulation material to verify the manufacturer, type of product, and thickness of insulation, and batch number.
·Ensure manufacturer’s instructions and MSDS are followed while handling & storage of insulation materials at site.
·Verify insulation materials are stored off the floor under shade in secured and well-ventilated areas away from moisture and water which may lead loosening of insulation strength.
·Ensure insulation materials are stored separately based on type, width, and thickness.
·Ensure different manufacturer’s products are not allowed to combine and stored separately.
·Verify materials are used in the same order in which they are delivered, so that the order of consumption is first-in-first-out.
·Ensure System/Subsystem testing, reinstatement, and painting completed and released from piping /equipment prior to start insulation.
·Ensure pipe work and equipment are insulated as per line list and isometric.
·Ensure equipment insulation is as per the equipment data sheet.
·Verify heat traced piping/equipment are released prior to application of insulation.
·Ensure equipment, paved areas etc., adjacent to components being insulated are protected from dripping compounds and sealants.
·Ensure piping and equipment is clean, dry, and free from grease, dirt, loose rust, and scale.
وصف الوظيفة
بتروفاك هي مزود خدمات دولي رائد لصناعة الطاقة، مع محفظة عملاء متنوعة تشمل العديد من شركات الطاقة الرائدة في العالم.
نحن نقوم بتصميم وبناء وإدارة وصيانة البنية التحتية لعملائنا. نحن نوظف ونكافئ ونطور موظفينا بناءً على الجدارة بغض النظر عن العرق أو الجنسية أو الدين أو الجنس أو العمر أو التوجه الجنسي أو الوضع الاجتماعي أو الإعاقة. نحن نقدر موظفينا ونعامل كل من يعمل لصالح أو مع بتروفاك بإنصاف ودون تمييز.
العالم يعيد التفكير في إمدادات الطاقة واحتياجات الأمن الطاقوي، مخططاً لانتقال مُرحّلي إلى مصادر الطاقة البديلة. نحن هنا لمساعدة عملائنا في تلبية هذه الاحتياجات المتطورة للطاقة.
هذا وقت مثير للانضمام إلينا في هذه الرحلة.
ندعم طلبات العمل المرنة واعتمدنا نهجاً هجيناً لمعظم وظائفنا المعتمدة في المكاتب. نطلب من الموظفين الحضور إلى المكتب ثلاث أيام على الأقل في الأسبوع.
هل أنت مستعد لجلب الطاقة الصحيحة لبتروافك ومساعدتنا في تحقيق مستقبل أفضل للجميع؟
المسمى الوظيفي: فاحِش فحص أول - الجودة (الطلاء والعزل) - ساحة فابن
مكان العمل: مصفح، أبوظبي.
المسؤوليات الأساسية:
الطلاء / الطلاء والتغطية:
·التأكد من أن الظروف الجوية مقبولة بما يتوافق مع المعايير/المواصفات المعمول بها (القيود البيئية والزمانية والاقتصادية).
·التأكد من اتباع تعليمات المصنع وMSDS أثناء التعامل مع مواد الطلاء/التغطية والمخلفات في الموقع وتخزينها.
·التأكد من توفر ورقة البيانات، والحفظ النسيجي للمواد واستخدام المادة الصحيحة.
·مراقبة أداء المقاولين، والتأكد من أن المُطبِّقين كفوئين وفي حالة وجود حاجة للحصول على شهادة صلاحية للعملية المستخدمة، وأن المعدات صالحة للخدمة.
·التأكد من أن معدات الاختبار والفحص صالحة للخدمة ضمن فترة المعايرة وأن الأفراد على دراية بكيفيتها.
·التأكد من تغطية منطقة اللحام قبل التفجير، عندما لم تكتمل اختبارات الضغط.
·التأكد من حماية شق الحافة، الأجهزة، إلخ قبل التفجير.
·التأكد من أن ملف/معايير سطح المعالجة يفي بالمطلوب.
·المراقبة المستمرة لنظافة السطح وتسجيل ملف سطح (يجب أن يحدث ثلاث مرات على الأقل خلال عملية الطلاء: قبل بدء أي أنشطة تجهيز سطح، بعد تجهيز السطح، قبل بدء الطلاء وبين كل تطبيق لطبقة من طلاء متعدد الطبقات).
·مراقبة سماكة الفيلم الرطب أثناء التطبيق وتقنية التطبيق.
·مراقبة سماكة الفيلم الجاف وفواصل إعادة الطلاء.
·التأكد من إزالة أو استبدال أي علامات هوية أو بطاقات قد أزيلت أو تم تغطيتها.
·بعد اكتمال نشاط الإتاحة الكلية إجراء فحص بصري واختبارات غير تدميرية و/أو تدميرية محددة.
·فحص بصري بعد كل طبقة (التأكد من اللون الصحيح، ومقدار اللمعان والتساوي وأنه خالٍ من الالتصاق بعد التجفيف/التصلب وخالٍ من الشقوق أو العيوب التي قد تضر بجودة الطلاء).
·شاهد اختبارات تدميرية حسب ما هو مطلوب وفق مواصفات المشروع (كاشف الشوائب، اختبار الالتصاق، اختبار المقاومة للصدمات، اختبار الفصل الكاثودي، سماكة الطلاء على جسم الحديد، سماكة الطلاء على الخَطّ اللحّام، اختبار التقشر، مدى الالتصاق الكلي، وجود فراغات تعرّي المعدن الفعلي).
·فحص أي أضرار وعيوب عند اكتمال كل مرحلة من أعمال الطلاء/التغطية.
العزل:
·فحص مادة العزل للتحقق من الشركة المصنّعة، ونوع المنتج، وسمك العزل، ورقم الدفعة.
·التأكد من اتباع تعليمات المصنع وMSDS أثناء التعامل مع مواد العزل وتخزينها في الموقع.
·التأكد من تخزين مواد العزل بعيداً عن الأرض وفي أماكن جيدة التهوية وبظل بعيداً عن الرطوبة والماء مما قد يؤدي إلى فقدان قوة العزل.
·التأكد من تخزين مواد العزل بشكل منفصل حسب النوع والعرض والسمك.
·التأكد من عدم خلط منتجات مصنعين مختلفين وتخزينها بشكل منفصل.
·التأكد من استخدام المواد بنفس الترتيب الذي تم تسليمها به، حتى تكون وتيرة الاستهلاك هي الأول من الداخل أولاً خارجاً.
·التأكد من إتمام واختبار النظام/النظام الفرعي، وإعادة التثبيت والطلاء وإصدارهما من خطوط الأنابيب/المعدات قبل البدء بالعزل.
·التأكد من عزل أنابيب ومعدات وفق قائمة الخطوط والمخطط هوائي.
·التأكد من أن عزل المعدات يتوافق مع ورقة بيانات المعدات.
·التأكد من أن أنابيب ومعدات ذات عزل مطفأة قبل تطبيق العزل.
·التأكد من حماية المناطق الملموسة والموصلات وغيرها من المكونات من التراكمات والمواد اللاصقة.
·التأكد من أن أنابيب ومعدات نظيفة وجافة وخالية من الشحم أو الأوساخ والصدأ والصدأ المتقلص.